SABAH FORESTRY DEPARTMENT

FOREST RESTORATION

Forest Restoration Program will be done in phases. The 1st phase of this program started in August 2013. SFD had appointed EZ Enterprise as the contractor to the 1st phase of 50 Ha restoration areas. This program will target open area of ex-camp sites, ex-stumpings and landing sites, ex-sawmill sites and other degraded forest gaps. Forest restoration program consist of several work specification i.e preliminary works, site preparation, supply raising and maintenance of seedlings, fertilizing, constructing temporary nursery and placing restoration signboards and also road maintenance within planting blocks.
In the year 2015, SFD had appointed Syarikat Indah Jaya as the contractor of the 5.0 Ha restoration area. The target area for restoration work as well as maintenance and fertilization is the open area. The contractor had completed their works including first maintenance and a 50gm fertilization work. Border demarcation for the planting block as well as the restoration signboard had been prepared.

In 2016, SFD had appointed Saramas as the contractor of the 25 Ha restoration area. The target area for restoration work as well as maintenance and fertilization is the open area. The contractor had completed their works including first maintenance and a 50gm fertilization work. Border demarcation for the planting block as well as the restoration signboard had been prepared.

In 2019, SFD had appointed M.B.A Enterprise as the contractor of the 20 Ha restoration area (Phase 4), Contract No. JP/SN/PPA-KLBKN/D11/02/2019, within a period of 8 weeks starting 16th October 2019 to 10th December 2019. The restoration work by M.B.A Enterprise has been completed with planting of Dipterocarp Species such as Selangan Batu. The restoration work was carried out near the riparian area.

In 2020, SFD had appointed Rezeki Berganda as the contractor of the 5 Ha restoration area (Phase 5), Contract No. JPHTN/KLBKN/NGR/D11/01/2020, within a period of 6 weeks starting 14th September 2020 to 26th October 2020. The restoration work by Rezeki Berganda has been completed with planting of Dipterocarp Species such as Kapur, Selangan Batu and Urat mata. The restoration work was carried out near the riparian area.



The table below shows the restoration planting within NGR SFM:

CONTRACTOR

BLOCK NO.

CONTRACT NO.

VALIDITY OF CONTRACT

AREA (HA.)

STATUS/REMARKS

START

END

EZ ENTERPRISE


JP/SN/KLBKN-D11/01/2013

August 2013

August 2015

50 Ha

Done by Dec 2014

Syarikat Indah Jaya   JPHTN/KA 300-5/1/22(6) 2nd November 2015 23rd November 2015 5.0 Ha Done by 23rd November 2015
Saramas   JP/SN/KLBKN-NGR/RESTORASI/08/2016 2nd November 2016 22rd November 2016 25 Ha Done by 22nd November 2016
M.B.A Enterprise   JP/SN/PPA-KLBKN/D11/02/2019 16th October 2019 24th December 2019 20 Ha Done by 15th August 2020
Rezeki Berganda   JPHTN/KLBKN/NGR/D11/01/2020 14th September 2020 26th October 2020 5.0 Ha Done by 23rd October 2020
Total area

105 Ha

 

 

As for now, the management is focusing on maintaining the existing restoration area of 80 Ha consists of Phase 1 (50 Ha) and Phase 3 (25 Ha).

 

The table below shows the maintenance work of the existing restoration area within NGR SFM:

 

Contractor Block No. Approval Offer Letter Work Period Area (Ha) Status / Remark
Start End
Sani & Farah Contractor   JPHTN/KA 300-5/1/41(10) 27 Apr 2017 24 May 2017 80 Done
MZN Enterprise   JPHTN/KA 300-5/1/JLD.5/50 14 Aug 2018 27 Aug 2018 80 Done
JR Enterprise   JPHTN/KA 300-5/1/JLD.5/73 12 Nov 2018 26 Nov 2018 80 Done
M.B.A Enterprise   JPHTN/KA 300-5/1/JLD.5/74 12 Nov 2018 26 Nov 2018 80 Done

 

 

Picture of Restoration Program 2019 (Phase 4)

 

Picture of Restoration Program 2020 (Phase 5)

 

 

Picture of Restoration Program 2016 (Maintainance Phase of 2018)

 

GALLERY

Pictures of Restoration Programme (2015)

 

Pictures of Restoration Programme 2016 (maintainance phase of 2017)

 





Picture of Restoration Program