In 2013, a total of 1,344.34 ha or 106.86% of the area were successfully planted in Bukit Piton, surpassing target area of 1,258 ha as planned in Annual Work Plan (AWP). The planting achievement is shown the following table:

Actual achievement of forest restoration in 2013
No. Compt.# Area (ha) Achievement (ha) Zone Contractor Funded By
1. 103 0 104.40 Conservation Pemborong Alam Hijau Yayasan Sabah
2. 104 100 200.00 Conservation Kontraktor Malaysia Yayasan Sabah
3. 105 0 62.10 Conservation Kontraktor Malaysia Yayasan Sabah
4. 106 0 20.36 Conservation Yayasan Sabah Yayasan Sabah
5. 108 100 52.41 Conservation Yayasan Sabah Yayasan Sabah
6. 110 25 85.80 Conservation Kontraktor Malaysia WWF (Malaysia)
180 19.67 Conservation Segama Forest Heritage Ent. WWF (Malaysia)
7. 111 155 81.00 Conservation Pertanian Kondowoi WWF (Malaysia)
0 41.00 Conservation Syt. Juta Jaya WWF (Malaysia)
8. 115 630 617.90 Conservation Segama Frontier Yayasan Sime Darby
116 68 59.70 Conservation
TOTAL : 1,258 1,344.34 106.86%  

While for maintenance activity, about 13,879.89 ha or 407.60% have been archived in 2013 surpassing the AWP target of 3,405 ha. The maintenance achievement is shown in the table following:

Actual achievement of maintenance work in 2013
No. Location Compt.# Target Area (ha) Achievement (ha) Contractor Funded By
1. Bt Piton FR 103 0 67.10 Pemborong Alam Hijau  
2. Bt Piton FR 104 0 98.49 Kontraktor Malaysia Yayasan Sabah
3. Bt Piton FR 105 50 390.33 Kontraktor Malaysia Yayasan Sabah
4. Bt Piton FR 106 200 417.68 YS Yayasan Sabah
5. Bt Piton FR 107 100 0 Kontraktor Malaysia Yayasan Sabah
6. Bt Piton FR 108 0 31.94 YS Yayasan Sabah
7. Bt Piton FR 109 311 935.76 Alam Bina Flora WWF (Malaysia)
30 28.80 Pertanian Kondowoi WWF (Malaysia)
98 441.45 Syt. Juta Jaya WWF (Malaysia)
59 231.36 Sulai-Sulaian WWF (Malaysia)
8. Bt Piton FR 110 439 1232.06 Kontraktor Malaysia WWF (Malaysia)
103 333.36 Impian Jaya WWF (Malaysia)
187 811.33 Segama Forest Heritage Ent. WWF (Malaysia)
9. Bt Piton FR 111 207 295.29 PertanianKondowoi WWF (Malaysia)
0 101.20    
10. Bt Piton FR 112 530 2,727.76 AY Ent. Yayasan Sime Darby
113 517 2,555.52
114 311 1,470.65
115 150 1,502.81
116 33 125.00
11. VJR Merisuli 121 80 82.00 Kontraktor Malaysia SFD
TOTAL : 3,405 13,879.89 (407.6%)  

Map showing proposed forest area to be restored in 2013

Summary Analysis for Monitoring Programme in 2013

In 2013, the rehabilitation monitoring programmes which were undertaken in various forest restoration activities within the Ulu Segama-Malua SFMP area showed that the mean mortality rate has reduced to 8.58% (as shown in Table below). This was due to the following practices such as improved technique of planting, better quality of planted seedlings, and on-time maintenance schedule. In compartment 107, no census has been carried out because the maintenance periods has exceeded more than 5 years after planting.

NO. CPT# RESTORED AREA (HA) MORTALITY RATE (%) NOTE
1. 105 263.00 6 20% census
2. 107 751.00 - 0% census
3. 109 718.00 9 20% census
4. 110 592.00 10 20% census
5. 111 187.00 8 20% census
6. 112 551.00 12 100% census
7. 113 512.00 8  
8. 114 309.00 14 100% census
9. 115 500.00 3  
10. 116 33.00 15 100% census
11. 121 324.00 13 20% census
12. Infapro 11,827.00 5 100% census
TOTAL : 16,567.00  
Mean Mortality (%)   8.58  

 